Models > ZDT925SSN0SS > Instructions

ZDT925SSN0SS General Electric Dishwasher - Instructions

All Instructions for the ZDT925SSN0SS
31 - 33 of 33
Keep searches simple. Use keywords, e.g. "leaking", "pump", "broken" or "fit".
Right part wrong description
I had to replace a docking port. Parts Select had the part, labeled as stainless, just as this survey indicates. Well folks, the part I received is 100% plastic. It it the correct part, just not stainless. Should it have been stainless due to a faulty plastic design? I don’t know.

I used Parts Select for the simple directions for installation. I was eventually linked to a YouTube video for a completely different docking port. Does my part slip on? Does it press in? I don’t know.

Needless to say, this has been a cheap but frustrating ordeal that is not yet over. Thanks for having the stainless, but really plastic, part and for having directions for some other part available.
Parts Used:
DOCKING PORT Stainless Steel
  • Al from HILTON HEAD, SC
  • Difficulty Level:
    Very Difficult
  • Total Repair Time:
    More than 2 hours
1 person found this instruction helpful.
Was this instruction helpful to you?
Thank you for voting!
Dishwasher not operating. Would fill, not operate, then drain.
Performed all checks on youtube...water coming in, course and fine filter cleaned, drain pump working (heard it come on and no water present and cycle end). Swapped water inlet valve bc it was the cheapest poss fix $19. No luck. Ordered circulation pump and motherboard. Swapped pump, very easy with machine out and turned on its back. Temp reinstall and ops checked good. Contacted Partselect for return slip, emailed immediately and sent thru post office.
Parts Used:
WATER VALVE AND HARNESS SERVICE ASM
  • Todd from PLYMOUTH, MA
  • Difficulty Level:
    Easy
  • Total Repair Time:
    30 - 60 mins
  • Tools:
    Nutdriver, Pliers, Wrench (Adjustable)
2 of 4 people found this instruction helpful.
Was this instruction helpful to you?
Thank you for voting!
missing screw for Spray Arm
Remove top rack stops, slide out upper rack from rack railing, turn over upper rack and attach spray arm using spray arm bearing and screw. Reassemble in reverse order.
Parts Used:
SCR B-16 HXW 1/2 Stainless Steel Screw 8-16 hxw 1/2 Stainless Steel
  • Russell from Rosharon, TX
  • Difficulty Level:
    Easy
  • Total Repair Time:
    15 - 30 mins
  • Tools:
    Screw drivers
0 of 3 people found this instruction helpful.
Was this instruction helpful to you?
Thank you for voting!
All Instructions for the ZDT925SSN0SS
31 - 33 of 33