Models > Y25 > Instructions

Y25 Yard Machines - Instructions

All Instructions for the Y25
1 - 3 of 3
Keep searches simple. Use keywords, e.g. "leaking", "pump", "broken" or "fit".
Fuel line broke
Removed the two screws holding the fuel tank to the main unit. Removed the two fuel lines and any stuck on rubber. Installed and installed two screws to mount the new tank. Slid fuel lines on their respective connectors. Done.
Parts Used:
Fuel Tank Assembly
  • Erik from ROBERTSDALE, AL
  • Difficulty Level:
    Really Easy
  • Total Repair Time:
    15 - 30 mins
  • Tools:
    Screw drivers
12 of 14 people found this instruction helpful.
Was this instruction helpful to you?
Thank you for voting!
Super Easy Install
The fuel tank is held in place by 2 screws. Simply take the screws off and pull off the fuel lines.
Take the new fuel tank. Put it in place and screw the 2 screws in to hold the fuel tank.
Connect the fuel lines and you're done.
This is the easiest repair I have ever done on any of my lawn equipment.
Parts Used:
Fuel Tank Assembly
  • Michael from GLENN HEIGHTS, TX
  • Difficulty Level:
    Really Easy
  • Total Repair Time:
    Less than 15 mins
  • Tools:
    Screw drivers
3 of 3 people found this instruction helpful.
Was this instruction helpful to you?
Thank you for voting!
Broken lower drive shaft cable (engine runs fine, trimmer string head doesn't spin).
Remove lower shaft housing alignment set screw, and bolt clamp that connects the lower and upper drive shaft housing. Then remove the 6 star head screws that hold split housing for the drive gears, and carefully split and separate the housing. Remove the broken drive shaft cable. Grease the replacement drive shaft cable full length (very important), and re-grease the drive gears before reassembly. Very quick and easy repair. Just be sure to grease the cable heavily full length, and the coupler that connects the upper and lower cables.
Parts Used:
Lower Shaft Housing Assembly
  • CV from Shasta Lake, CA
  • Difficulty Level:
    Very Easy
  • Total Repair Time:
    15 - 30 mins
  • Tools:
    Screw drivers, Socket set
1 person found this instruction helpful.
Was this instruction helpful to you?
Thank you for voting!
All Instructions for the Y25
1 - 3 of 3