Models > CRE500 > Instructions

CRE500 Maytag Range - Instructions

All Instructions for the CRE500
136 - 143 of 143
Keep searches simple. Use keywords, e.g. "leaking", "pump", "broken" or "fit".
Light bulb failure
Received the part the day after ordering. Appreciated the quick service and repair took less than a minute.
Parts Used:
Light Bulb - 40W
  • Grant from Alexandria, VA
  • Difficulty Level:
    Really Easy
  • Total Repair Time:
    Less than 15 mins
Was this instruction helpful to you?
Thank you for voting!
drip pan were burnt out
simply remove the burner take out the drip pan and bowl individually. Install the new one and replace the burner. no tool was used.
Parts Used:
Chrome Drip Bowl - 8 inch Drip Bowl - 6 Inch
  • Delroy from Miramar, FL
  • Difficulty Level:
    Really Easy
  • Total Repair Time:
    Less than 15 mins
Was this instruction helpful to you?
Thank you for voting!
replace the cook stove's drip bowls instead of cleaning them
I removed the burners and then the older drip bowls of the cook stove--and then I put on the new drip bowls and put back on the burners. My mechanical skills were sufficient for the replacement of the drip bowls.
Parts Used:
Chrome Drip Bowl - 8 inch Drip Bowl - 6 Inch
  • Dallas from Arlington, TX
  • Difficulty Level:
    Really Easy
  • Total Repair Time:
    Less than 15 mins
Was this instruction helpful to you?
Thank you for voting!
The surface burner socket that the burner plugs into melted.
Cut the old wires off, removed the screw holding the clamp, installed the new parts. Problems I encountered were the wire nuts. They were too small for the wire gage of the replacement part and the original oven. I had larger wire nuts in my workshop. Also, why so many extra parts like the shrink wrap tubing, two metal clamps to hold the socket, etc.
Parts Used:
Surface Burner Plug-In Block Kit
  • Gary from Chesapeake, VA
  • Difficulty Level:
    Easy
  • Total Repair Time:
    Less than 15 mins
  • Tools:
    Screw drivers
Was this instruction helpful to you?
Thank you for voting!
I needed to replace to two 8* drip bowls on the kitchen range
(a) I took out (and threw away) two stained 8* chrome drip bowls on my kitchen range; (b) ti put in two new 8" chrome drip bowls on my kitchen range. I'm pleased that I was equal to the task.
Parts Used:
Chrome Drip Bowl - 8 inch
  • Dallas from Arlington, TX
  • Difficulty Level:
    Really Easy
  • Total Repair Time:
    Less than 15 mins
Was this instruction helpful to you?
Thank you for voting!
Burner coil was falling apart.
Used new plug in coil burner.
Parts Used:
Drip Bowl - 6 Inch Chrome Drip Bowl - 8 inch
  • Mary Kay from North Charleston, SC
  • Difficulty Level:
    Really Easy
  • Total Repair Time:
    Less than 15 mins
Was this instruction helpful to you?
Thank you for voting!
Drip bowls were all rusted.
Removed old rusted drip bowls and put in the new ones. Very easy to do and needed no tools. It made my 25 plus Jenn Air look new again!
Parts Used:
Chrome Drip Bowl - 8 inch Drip Bowl - 6 Inch
  • Robin from Seneca, SC
  • Difficulty Level:
    Really Easy
  • Total Repair Time:
    Less than 15 mins
Was this instruction helpful to you?
Thank you for voting!
old drip bowl was worn out
new drip bowl fit perfectly and was a snap to install.
Parts Used:
Chrome Drip Bowl - 8 inch
  • Richard from Germantown, MD
  • Difficulty Level:
    Really Easy
  • Total Repair Time:
    Less than 15 mins
Was this instruction helpful to you?
Thank you for voting!
All Instructions for the CRE500
136 - 143 of 143